Info
Size: 32,600 Sq Ft
Cost: $1.1M
Completion: August 2021
Details
Brookwood Elementary received an overhaul of the existing interior ahead of a major renovation and addition to the building.
In 2020, all new windows and doors were installed throughout the building. The ceilings were replaced with new tiles and the hallways and classrooms received fresh paint to brighten them up. In addition to these cosmetic updates, a new VUV unit was installed to provide air conditioning to the entire school building.
This was the first phase of a large 2 part project.